You don't have javascript enabled. Good luck with that.
Pencarian
Pemprov Diminta Monitoring Pembangunan Waduk

City Asked to Tightly Monitor Dam Construction

City DPRD's Banggar has asked Jakarta Provincial Government to monitor the dam construction in some areas in Jakarta.

It must be monitored so its existence can be felt by locals

It is needed considering the rainy season is predicted to begin in October 2018.

Giri Kencana Reservoir Construction Reaches 40 Percent

"October is predicted to rain. The dam is made to anticipate flooding. So the construction must be supervised to finish on time," expressed Ida Mahmudah, member of City DPRD's Banggar, Sunday (9/16).

Responding on this matter, City Secretary, Saefullah admitted that has asked SKPD to monitor the dam construction. 

"It must be monitored so its existence can be felt by locals," he stated.

As for the information, City Water Resources Dept. this year is constructing some dams to anticipate floods.

They are like Cimanggis Dam, Kampung Rambutan Dam, and Jagakarsa Dam.

Linked News
Popular News indeks
  1. Rano Reaffirms Jakarta's Vision of Becoming a City of Cinema

    access_time22-10-2026 remove_red_eye5415 personBudhi Firmansyah Surapati
  2. Jakarta Provincial Government Receives a Grant of Rp 9.6 Billion in KPK`s Seized Assets

    access_time20-10-2026 remove_red_eye4571 personDessy Suciati
  3. Drainage Channels Along Two Rawajati Roads Dredged

    access_time21-10-2026 remove_red_eye1764 personTiyo Surya Sakti
  4. Jakarta Pushed for Education Equity to Retain Top Student City Rank

    access_time19-10-2026 remove_red_eye994 personFakhrizal Fakhri
  5. Jakarta Esports 2026: Celebrating Local Games, Music and More

    access_time19-10-2026 remove_red_eye937 personAldi Geri Lumban Tobing